Delivering exceptional interior and exterior designs that prioritize functionality, comfort, and aesthetic appeal for a welcoming and efficient aid center.
The structural system is composed of pillars and beams with the same section, connected by a metallic cube that works as a structural node. When combined, they can result in different configurations of layouts and attend several programs within a limit of up to three floors, either in a flat or sloped terrain. the external and internal finishings, such as floors, walls and linings, are also conceived as part of a docking system. In this way, you can assembly and disassemble the residence in the lot without generating waste or consuming natural resources such as water - abundantly wasted in conventional construction. From design to conclusion can take only 6 months.
The structural system is composed of pillars and beams with the same section, connected by a metallic cube that works as a structural node. When combined, they can result in different configurations of layouts and attend several programs within a limit of up to three floors, either in a flat or sloped terrain. the external and internal finishings, such as floors, walls and linings, are also conceived as part of a docking system. In this way, you can assembly and disassemble the residence in the lot without generating waste or consuming natural resources such as water - abundantly wasted in conventional construction. From design to conclusion can take only 6 months.
The structural system is composed of pillars and beams with the same section, connected by a metallic cube that works as a structural node. When combined, they can result in different configurations of layouts and attend several programs within a limit of up to three floors, either in a flat or sloped terrain. the external and internal finishings, such as floors, walls and linings, are also conceived as part of a docking system. In this way, you can assembly and disassemble the residence in the lot without generating waste or consuming natural resources such as water - abundantly wasted in conventional construction. From design to conclusion can take only 6 months.